Watch: Drone shows £1bn roadworks one year in
Footage has been released showing the latest progress on a £1bn upgrade of the A428.
Work between the Black Cat roundabout in Bedfordshire and Caxton Gibbet in Cambridgeshire includes a new 10-mile (16km) dual carriageway, bridges and junctions connecting to the existing road.
The project has seen 18,000 cubic metres of concrete poured, which is equivalent to seven Olympic-sized swimming pools.
National Highways said the scheme remained on track to open to traffic in spring 2027.
Follow Beds, Herts and Bucks news on BBC Sounds, Facebook, Instagram and X.